久久久久人妻啪啪一区二区-久久久久人妻一区二区三区-久久久久人妻一区精品-久久久久人妻一区精品色-久久久久人妻一区精品色欧美-久久久久人妻一区精品性色av

Service Flow

Service process

Common Problem

1.What information do PCBA processing need to provide?

Electronic version controlled BOM files, PCB files, GERBER files, PDF location map, special welding requirements, etc.

2.PCBA routine processing flow?

Printing - patch - reflow -AOI inspection -QC sampling - plug-in - wave soldering - repair welding - Cleaning - general inspection -ICT-FCT-OQC- packaging

3.What are the requirements for the PCB production routine?

1. the process edge 5mm (especially the PCB plate edge has device plate, special shape plate) and the process edge needs to increase in the long side of the 2. diameter 1-1.5mm MARK point, to ensure the accuracy of the mounting; 3. if the tailor board, it is necessary to pay attention to the splicing way, such as too much splicing board or V cutting too deep, easy to cause PCB plate change shape.

4.What do you want to do?

1.PCB board components number 2.PCB board size less than 50mm must do the puzzle. 3. before making a plate, we should contact our technology and communicate with each other.

5.How to control the quality of welding?

According to the industry IPC-610A-F standard and customer special requirements, strict control and control from human, machine, material, law and ring are carried out. The specific welding quality control and control should be defined according to different PCB boards.

6. In which case is the design of PCB board unreasonable, which leads to poor welding?

There can be no holes on the 1.PCB welding plate. As the tin inflows into the hole, the size of the weld plate of the solder less tin 2. patch is not consistent with the BOM requirements. The size of the large weld plate is small and the size of the small welding disk is large; the diameter of the 3. plug-in plug is small or large or the distance between the two holes is not matched with the material. 4.PCB board components layout, chip and other large devices, plug-in materials should be placed as much as possible TOP surface, BOT as far as possible design resistance capacitance parts.

7.What are the requirements for processing materials for incoming materials?

1. the material is complete, the 2. incoming packaging is clearly described, and there are no deformation, oxidation, overdue and wrong material. 3. as far as possible for vacuum packing

8.In what case is it recommended to increase the soldering of wave peak control tools?

1. double sided patch board, and product plug-in materials are more. 2. has begun to mass production.

9.How long is the delivery date under normal conditions?

After the material is complete, under normal circumstances, according to the production plan, in about 1-2 weeks.

亚洲风情亚aⅴ在线发布 | av无码国产精品色午夜 | 亚洲色婷婷六月亚洲婷婷6月 | 亚洲另类自拍丝袜第五页 | 妺妺窝人体色www聚色窝 | 人妻被按摩师玩弄到潮喷 | 999在线视频精品免费播放观看 | 含紧一点h边做边走动免费视频 | 全部免费毛片在线播放 | 久久亚洲av成人出白浆无码国产 | 午夜免费视频 | 亚洲 自拍 另类小说综合图区 | 日韩国产成人无码av毛片 | 亚洲欧洲日产国码av系列天堂 | 黄页网站在线看 | 国产成人综合在线视频 | 国产精品无码一本二本三本色 | 天堂草原电视剧在线观看图片高清 | 啦啦啦中文在线观看日本 | 久9re热视频这里只有精品 | 五月天激情小说 | 999久久欧美人妻一区二区 | 欧洲熟妇色xxxxx欧美老妇伦 | 香蕉久久夜色精品升级完成 | 亚洲一区二区三区播放 | 国产精品自在线 | 国产成人精品a视频一区 | 三级国产三级在线 | 妺妺窝人体色www在线下载 | 亚洲av无码有乱码在线观看 | 国产亚洲真人做受在线观看 | 国产精品二区一区二区aⅴ污介绍 | 久久无码专区国产精品s | 精品一区二区三区的国产在线观看 | 美女露出奶头扒开尿口免费网站 | 久久久中日ab精品综合 | 18禁黄无遮挡网站 | 国产精品高潮呻吟av久久4虎 | 亚洲国产欧美国产综合一区 | 日本高清无卡码一区二区久久 | 一本色道久久88精品综合 |